Project Management Maturity In The Ethiopia Construction Sector: The Case Of Bamacon Engineering Plc

dc.contributor.advisorAsrat, Bahran (PhD)
dc.contributor.authorMulugeta, Saron
dc.date.accessioned2020-12-28T06:26:13Z
dc.date.accessioned2023-11-04T14:26:36Z
dc.date.available2020-12-28T06:26:13Z
dc.date.available2023-11-04T14:26:36Z
dc.date.issued2020-07
dc.description.abstractThis study is conducted to assess project management maturity levels of Bamacon Engineering PLC with specific objective of measuring and identifying actual practice of the company on managing projects. The scope of the study is limited to projects taking place in Bamacon Engineering PLC. The maturity assessment is based on a five level project management maturity model devised by PM Solutions. The study’s research design is descriptive and the research approach is mixed (qualitative and quantitative).The sample size of the study is fifty-two respondents of the questionnaire and four project managers for the interview. The sampling technique used is non-probability purposive sampling. Hence, Survey questionnaire and interview is prepared based on reviewed literature to assess the project management maturity of Bamacon Engineering Plc. Primary and secondary method of data collection is used from respondents and detail literatures respectively. Then the data collected is analyzed using statistical software package (SPSS). Results indicate that the project management maturity level of the organization is found to be at level 3.59. This shows that the organization is at good performance level but needs improvement on each project management knowledge areas in order to level up the maturity level.en_US
dc.identifier.urihttp://etd.aau.edu.et/handle/123456789/24365
dc.language.isoen_USen_US
dc.publisherAddis Ababa Universityen_US
dc.subjectProject management Knowledge areasen_US
dc.subjectproject management maturityen_US
dc.subjectcompany on managing projectsen_US
dc.titleProject Management Maturity In The Ethiopia Construction Sector: The Case Of Bamacon Engineering Plcen_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Saron Mulugeta.pdf
Size:
1.53 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description: