Factors Affecting Construction Delay in Real Estate Sector: A Case Study of Selected Projects in Addis Ababa, Ethiopia

No Thumbnail Available

Date

2026-07

Journal Title

Journal ISSN

Volume Title

Publisher

Addis Abeba Universty

Abstract

This study identifies the factors affecting construction delay in the real estate sector a case study of selected projects in Addis Ababa, Ethiopia. The primary objective is to identify the major causes of delays in building construction projects, which are vital to the city's socio economic growth. The research adopts a quantitative multi-case study design, focusing on five specific project categories luxury apartments, mid-income housing, mixed-use buildings, G+4 to G+7 residences, and large private estates. To ensure a representative and expert data set, purposive sampling was used to select professionals with direct experience and knowledge of project delays, resulting in 133 valid responses from a distributed 150 questionnaires. Data analysis was conducted using descriptive statistics, Pearson correlation, multiple regression, and the Relative Importance Index(RII). The findings reveal that while all stakeholder and external factors show a positive significant correlation with delays, client-related factors specifically financial constraints, slow decisionmaking, and scope changes are the only statistically significant predictors in the regression model. However, the RII analysis identifies external factors, including material shortages, exchange rate fluctuations, and price variations, as the most critical drivers of delay across all project types the study concludes that construction delays in Addis Ababa's are primarily a result of managerialand coordination failures rather than technical limitations.

Description

Keywords

Construction delays, Relative Importance Index (RII), Multi-case study

Citation