The Effect of Project Constraint on Project Performance in the Case of Ayat 40/60 Building Project

No Thumbnail Available

Date

2023-07-13

Journal Title

Journal ISSN

Volume Title

Publisher

A.A.U

Abstract

The main objective is to analyze the effect of project constraint in construction project performance at Ayat 40/60. Primary and Secondary data sources were used to achieve the specified objectives of the study. Collected information or data were organized and presented in the form of tables and graphs. To analyze quantitative data explanatory statistics and an equation such as multiple regressions were also used, as well Using 87 discovered factors divided into 5 groups, a questionnaire survey was run. 150 of the 154 questionnaires that were distributed were returned. 150respondents were used in the primary data collection and a standardized questionnaire was used. To come up with the results the researchers employed explanatory analysis. The researcher revealed that the project constraints highly contribution in project performance. According to the study parameters including cost, scope, and quality had a big impact on how well the Ayat 40/60 project performed as a result of project constraints during project execution. The other factors time and resource have insignificant impact on project performance. The results also demonstrate that while time, resource, and quality-related factors have a negative association with building construction performance, cost and scoperelated factors have a positive greater favorable effect on project performance. The project cost and scope have also contribution on the performance of the project. The study concluded that cost related factors and scope related factors are positively and significantly influence project performance but quality related factors were found positive but not significant factor influencing the project performance. On the other hand time and resource related factors were found negative and but not significant. It is therefore recommended that project constraints can never be eliminated and each project will have a different set of constraints the only way to properly manage constraints. Policies and procedures should be strengthening by the construction bureau. The stakeholders have to develop a plan and a strategy for each project phase, have good quality control, balance resource use, and have a thorough understanding of each restriction and transparent communication between project team members. Key words: Multiple Regression Analysis, Project Constraint, Ayat 40/60 project, Construction performance

Description

Keywords

Citation

Collections