A Pre and Post Intervantional Study on Medical Equipment Maintenance System in all Africa leprosy, Tuberculosis and Rehabilitation Training Centre (ALERT), Addis Ababa, Ethiopia, June 2018

dc.contributor.advisorAddise, Mesfin (MD, MPH)
dc.contributor.authorTamirat, Yemiserach
dc.date.accessioned2018-12-05T11:06:41Z
dc.date.accessioned2023-11-05T15:14:52Z
dc.date.available2018-12-05T11:06:41Z
dc.date.available2023-11-05T15:14:52Z
dc.date.issued2018-06
dc.description.abstractIntroduction- Medical equipment is defined as any devise that is used in the rendering of patient care [1]. According to the world health organization, Medical equipment is used for the specific purposes of diagnosis and treatment of disease or rehabilitation following disease or injury. Problem Statement – The medical equipment maintenance system as a whole (both the IPM and corrective maintenance) in All Africa Leprosy, Tuberculosis and Rehabilitation Training Centre (ALERT) is not functioning well, the management and the maintenance system is not well organized and is not done in a regular interval, in addition the department of biomedical engineering is newly opened. Objective - The general objective of the study is to improve the preventive maintenance system in ALERT hospital. The specific objectives for the study were to increase the CR from 79% to 90%,LR from 25% to 60%and IPM from 40% to 60%by May 2018. Project Design/Methods: Pre-post interventional study was conducted at ALERT hospital located in the capital city of Addis Ababa with a catchment area of approximately five million populations with the total budget of the project 16000 at ALERT hospital from February to June 2018. Data Collection Procedure and Analysis - A pretested questioner which was developed by reviewing different literatures, which also includes international standards in equipment maintenance was used. SPSS version 20.0 was used for data entry, coding, cleaning and analysis. Chi square test of association was used to detect the association between pre and post intervention studies. The finding was presented using tables, graphs and texts. Result– The result of one month implementation of selected strategies showed that a significant improvement of preventive maintenance in the hospital.This was objectively measured by an increment in the completion rate from 79% to 90.5%, location rate from 25% to 61% and inspection and preventive maintenance yield from 40% to 72%. Conclusion and Recommendation - The result of this capstone project showed that, those selected strategies were effective on improving preventive maintenance system. Although the finding proves the effectiveness of selected strategies, user training is still a gap for the hospital. So, it will be better if these selected strategies will be implemented in a larger scale by including all clinical service providing departments.en_US
dc.identifier.urihttp://etd.aau.edu.et/handle/123456789/14881
dc.language.isoen_USen_US
dc.publisherAddis Ababa Universtyen_US
dc.subjectMedical Equipmenten_US
dc.titleA Pre and Post Intervantional Study on Medical Equipment Maintenance System in all Africa leprosy, Tuberculosis and Rehabilitation Training Centre (ALERT), Addis Ababa, Ethiopia, June 2018en_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Yemiserach Tamirat.pdf
Size:
3.55 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description: