A Project Work Submitted To Addis Ababa Univerisity School Of Commerce In Partial Fulfillment Of The Requirements For The Award Of The Degree Of Master In Project Management:

dc.contributor.advisorMohammed, Abdurazak(PhD)
dc.contributor.authorYohannes, Aschalew
dc.date.accessioned2022-01-24T06:31:17Z
dc.date.accessioned2023-11-04T14:26:58Z
dc.date.available2022-01-24T06:31:17Z
dc.date.available2023-11-04T14:26:58Z
dc.date.issued2021-07-06
dc.description.abstracthe objective of this study was to assess the effectiveness of technical evaluation process in selecting building contractor in Addis Ababa. The conceptual framework was designed by considering technical evaluation process as dependent variable and technical evaluation criteria, procurement ethical standard, basic procurement principle as independent variable. The data were obtained by closed-ended questionnaires consisted of 37 questions with five-point Likert scale. Both Descriptive and inferential statistics were used to analyze the data and interpretation of the results. Pearson Correlation analysis shows that there was statistically significant positive relationship between all independent variable; technical evaluation criteria, ethical standard, and basic procurement principle and dependent variable; technical evaluation process. Moreover, the regression result revealed that technical evaluation criteria, ethical standard, and basic procurement principle were found to have their own positive and significant effect on technical evaluation process. Basic procurement principle was found to be the most predictor of technical evaluation process. Technical evaluation criteria and ethical standard had also significant contribution in predicting technical evaluation process in their respective order. The mean score result of basic procurement principles, procurement ethical standards and technical evaluation criteria are 3.86, 3.80, and 3.73 respectively and the mean score result of assessment of general opinion of respondents about technical evaluation process is 3.77. In general, the technical evaluation process is not carried out at the required effectiveness level and the researcher concluded that the technical evaluation criteria, ethical standard, and basic procurement principle could have positive significant effect on technical evaluation processen_US
dc.identifier.urihttp://etd.aau.edu.et/handle/123456789/29557
dc.language.isoen_USen_US
dc.publisherAddis Ababa Universityen_US
dc.subjectTechnical Evaluation Processen_US
dc.subjectTechnical Evaluation Criteriaen_US
dc.subjectEthical Standarden_US
dc.subjectBasic Procurement Principleen_US
dc.titleA Project Work Submitted To Addis Ababa Univerisity School Of Commerce In Partial Fulfillment Of The Requirements For The Award Of The Degree Of Master In Project Management:en_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Aschalew Yohannes.pdf
Size:
844.2 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description: