Highway Drainage Facilities Problems (Case Study – Assessment of Drainage Problems in Adama)

No Thumbnail Available

Date

2015-12

Journal Title

Journal ISSN

Volume Title

Publisher

Addis Ababa University

Abstract

Most designs of roads projects have limitations with drainage related issues. Especially, town section drainage design and provision needs a great consideration as the scale of damage due to lack of proper drainage facilities provision is high. This research paper is an assessment of drainage problems in Adama, section of the Nazareth-Assela road project, Ethiopia. Based on the site investigation, the design and the available data of the area, the analysis has been done. The design floods are estimated using SCS method per the requirement of Ethiopian Roads Authority Drainage Design Manual, 2013. The spread sheet program has been developed to estimate the design flood using SCS method. The existing structures hydraulics data have been modeled using Hydrologic Engineering Center-River Analysis System and HY8 Culvert analysis to determine the capacity. The results of the finding include: a) Inadequate structure provision which the hydraulic capacity of the crossing structures, being less than the design discharge b) Lack of properly designed side drains c) Lack of inlet/outlet protection works of the crossing structures d) Growth of vegetation at inlet and outlet of the crossing structures and e) Siltation and blockage with sand and stone respectively of the crossing structures. In this connection recommendations forwarded include: a) Due consideration, to be given to important factors such as appropriate design method to be employed, variability of the climate and future settlement to be taken into account during the design of the drainage facilities b) Ensure that the drainage facilities are integrated with the master plan c) Ensure that if the town administration takes measure to keep the serviceability of the road, the rehabilitation needs to be supplemented by the design and d) Continuous monitoring of the drainage facilities.

Description

Keywords

Designs of roads projects

Citation