Causes of Delay in Construction Project of Private Real Estate

No Thumbnail Available

Date

2018-06-01

Journal Title

Journal ISSN

Volume Title

Publisher

Addis Ababa University

Abstract

Current practice of the real estate industry shows that it is a rare event that the projects are completed on the scheduled time, budgeted cost, and desired quality because the construction projects experience a tremendous amount of delays. Timely completion of construction project is a major criterion of project success. The need to control the causes of delays during the construction process comes out when the number of delay project has been increasing from time to time. Hence, it is essential to identify the causes of this problem from the early stage of construction project. The objectives of this study are to study the causes of delay in term of frequency occurrence and severity effect. A total of 70 contractors and consultants with an experience in construction of private real estate project are involved in the study. A questionnaire survey was conducted to identify the significant causes of delay in order to avoid or minimize their impact on construction project. The perspective of contractors, consultants and client has been analysed and ranked based on Relative Important Index (RII). The study indicate that the top major causes of delay were ´Owner interference´, ´Frequent change orders´, ´Long waiting time for approval of tests and inspection´, ´Shortage of construction material´, ´Mistakes in design documents´, ´Inappropriate organizational structure linking all parties involved in the project´, ´Mistakes and discrepancies in design documents´, ´Discrepancies in contract document´ and ´Delays caused by subcontractors´. In addition, the top major effects of delay were; time overrun, cost overrun, dispute, arbitration, litigation and abandonment.

Description

Keywords

Real estate, building, construction, delay, contract,

Citation