The increased demand for electrical energy due to increased industrialization and population growth of Dire Dawa and nearby cities has become a challenge to supply adequate power using the national grid to Eastern region of Ethiopia. One reason for these power shortages is the insufficient current carrying capacity of existing high voltage alternating current, (HVAC), transmission lines supplying the area. High voltage direct current (HVDC) transmission lines are a possible solution as they provide more power than HVAC lines. New parallel HVAC lines, or converting the existing HVAC line to HVDC lines are possible solutions to improve power delivery in the area. This thesis investigates the technical feasibility of upgrading existing HVAC lines to HVDC. This option allows the power transmission rating to be more than doubled and the specific transmission losses to be substantially reduced without having to widen the right-of-way. What is more, such conversions cost only a one third the cost of building a new line. Thus main contribution of this thesis work is the evaluation of a HVDC system including study of technical compatibility of existing system conversion to HVDC as a solution to overcom power delivery shortages to Eastern region of Ethiopia. From the technical performance the bipolar HVDC lines has a loss as much as 69.75% lower compared to the existing transmission lines and the monopolar HVDC line has a loss as much as 83.02% lower compared to the existing transmission lines. On the other hand, the transmission powers of the bipolar HVDC line at ± 500 kV increase by 217% and the monopolar HVDC line at ± 500 kV increase by 75.8% from the power transfer capacity of the existing HVAC line. From the cost analysis the cost of conversion is approximately 36% of cost of new HVAC line. Moreover, conversion of the existing transmission line to DC line is both financially and economically feasible. Key Words: HVAC, HVDC,LLC,HVDC control, Transmission line efficiency, corona loss, investment cost, internal rate of return.

Description

Keywords

Hvdc, Llc, Hvdc control, Transmission line efficiency, Investment cost, Internal rate of return, Corona loss, Hvac

Citation