Energy Audit of Ambo Mineral Water Factory

dc.contributor.advisorEdessa, Dribssa (PhD)
dc.contributor.authorLami, Tamene
dc.date.accessioned2019-11-11T07:32:36Z
dc.date.accessioned2023-11-04T15:23:14Z
dc.date.available2019-11-11T07:32:36Z
dc.date.available2023-11-04T15:23:14Z
dc.date.issued2019-10
dc.description.abstractAmbo Mineral water factory is one of energy consuming factories in this country. In the factory, the thermal energy developed by the boiler goes to bottle washer and energy from electricity is used to power electrically driven equipments: electric motors and their driving systems, and lighting. According to 2018(G.C) energy bill data, the factory paid for both thermal energy (oil) and electric energy 5,953,395.00 Birr and 1,008,685.00 Birr respectively. The energy consuming systems of the factory such as electric motors, boilers, air compressors, water pumps and steam distribution systems were audited. To perform the energy audit of these major energy consuming systems, different data (21-months, October,2017 to June, 2019 GC) were collected and analyzed by using portable instruments, the instruments installed on systems, nameplate, referring factory log sheet with the gross calorific value of 44,800kJ/kg of diesel oil. From the detail energy audit, by replacing the existing electric motors and water pumps annual energy cost of around 46,000birr and 128,700birr can be saved respectively. The energy audit of the boiler indicated that, its overall efficiency was 72.2% with possible energy conservation measures of repairing feed water treatment plant(about 267,800Birr can be saved annually) and insulating boiler surface(26,300birr can be saved annually). Finally, the energy audit on steam distribution lines indicated as around 71,700 birr can be saved annually.en_US
dc.identifier.urihttp://etd.aau.edu.et/handle/123456789/20086
dc.language.isoen_USen_US
dc.publisherAddis Ababa Universityen_US
dc.subjectthermal energyen_US
dc.subjectEnergy Auditen_US
dc.subjectt of Ambo Mineral Water Factoryen_US
dc.titleEnergy Audit of Ambo Mineral Water Factoryen_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Lami Tamene.pdf
Size:
2.63 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description: