Project performance has been measured using the triple constraints of time, cost, and quality . Though these constraints remain the same, recent scholars argue that additional criteria must be included to measure project performance. This research aims to study the effect of project cost management and project scheduling practices on IT projects performance in the case of Ahadu banks S.C. Data has been collected using standard questionnaire from 70 respondents using census. The study uses a quantitative, descriptive and explanatory research design. the descriptive part discusses the current project performance while the explanatory part shows cause and effect relationships of project cost management and project scheduling practices with IT projects performance. Reliability test result confirm the consistency of questionnaire items with cronbach‟s alpha value greater than 0.7 which is considered a threshold value. Also validity of items checked using expert review and face validity technique. Data analyzed by means of descriptive statistics using mean and standard deviation. Mean result was around two in five point likert scale used in the questionnaire that implies there is a tendency of disagreement on good project cost management, project scheduling practices, and project performance. Standard deviation result for all variables is around 0.5, that indicates there is low variability in responses. Analysis of correlation and regression performed to identify the relationship and effect between the variables of the study. Accordingly, the findings shows that project cost management and project scheduling practices have a significant impact on project performance in Ahadu bank. 36.2 % of project performance is predicated by project cost management and project scheduling practices. However, project scheduling practice that have a (β=0.462) value found to be more impactful x relative to project cost management which have a (β=0.311) value. The study draw a conclusion from the findings that IT projects performance in Ahadu bank is strongly challenged by poor time and cost management. Specially project time management poses a relatively greater challenge towards improved IT project performance than project cost management. Finally the research recommends various stakeholders to give a due attention for project cost and time management to improve timely project completion rate, to decrease the number of rescheduling practices, to minimize cost overruns, and ultimately to improve IT projects‟ performance

Description

Keywords

Project performance has been measured using the triple constraints of time, cost, and quality

Citation