Statistics for Integration of Ergonomic and Work Study to Redesign J-Bolt Production Line: The Case of Ferric Belt Metal Processing and Engineering Factory
Total visits
views | |
---|---|
Integration of Ergonomic and Work Study to Redesign J-Bolt Production Line: The Case of Ferric Belt Metal Processing and Engineering Factory | 8 |
Total visits per month
views | |
---|---|
April 2025 | 0 |
May 2025 | 0 |
June 2025 | 1 |
July 2025 | 0 |
August 2025 | 3 |
September 2025 | 0 |
October 2025 | 0 |
File Visits
views | |
---|---|
Wakweya Tolera.pdf | 11 |