Statistics for Integration of Ergonomic and Work Study to Redesign J-Bolt Production Line: The Case of Ferric Belt Metal Processing and Engineering Factory
Total visits
views | |
---|---|
Integration of Ergonomic and Work Study to Redesign J-Bolt Production Line: The Case of Ferric Belt Metal Processing and Engineering Factory | 5 |
Total visits per month
views | |
---|---|
January 2025 | 0 |
February 2025 | 0 |
March 2025 | 2 |
April 2025 | 0 |
May 2025 | 0 |
June 2025 | 1 |
July 2025 | 0 |
File Visits
views | |
---|---|
Wakweya Tolera.pdf | 8 |