Tendaho Dam Project envisages a construction of a 42 m high embankment dam across Awash
River. The site is located at coordinates 41o 00’ East and 11o 07’ North about 570 km from Addis
Ababa in Afar Regional state. The main purpose of this dam project is to provide irrigation to
sugar cane plantation covering a total area of 60,000 hectares. The success of this project will
entirely depend on its safe functioning and the irrigation needs of the agricultural lands.
Therefore, it becomes essential that the dam foundation must be stable against the loads imposed
by the dam and the impounded water. Besides, to meet out the primary purposes of providing
irrigation to the project site, it is necessary that the dam foundation is free from any excessive
seepage. Further, the construction material used to form the various zones of the embankment
must serve as a water barrier and should be resistant to the piping failure. Therefore, in the light
of these important points the main objective of the present study were framed as; (i) to determine
the suitability of the dam foundation and the embankment against seepage and (ii) to study the
suitability of the construction material, to be utilized in the embankment. Thus, in order to
achieve these objectives systematic surface and subsurface explorations were made.
Representative samples were collected from the foundation and borrow areas, and laboratory tests
were conducted to know index and engineering properties of the soils. Besides, secondary data
has also been procured from the project Authorities. Later, an integrated analysis was made to
know the foundation seepage conditions and to work out the suitability of the construction
material for the embankment dam. Based on the findings a detailed evaluation of the seepage
condition in the foundation area and through the embankment was carried out