Hydraulic Network Modeling and Upgrading of Legedadi Subsystem Water Supply

No Thumbnail Available

Date

2012-03

Journal Title

Journal ISSN

Volume Title

Publisher

Addis Ababa University

Abstract

The thesis paper focused on the water supply network of Addis Ababa, capital city of Ethiopia. The Addis Ababa water supply has three subsystems according to its principal water supply sources. These are Akaki, Gefersa and Legedadi subsystem. The paper considered the legedadi subsystem. The main objective of this study is to improve the legedadi water supply distribution service system and control its operation with the aid of computer analysis. To analyze and improve the existing water distribution system, a model was developed utilizing Water CAD software. The model can be used to solve ongoing problems, analyze proposed operational changes, and prepare for unusual events. By comparing model results with field operations, the operator can determine the cause of problems in the system and formulate solutions that will work correctly the first time. The model run was performed for different scenarios to analyze the system model, what if conditions. These scenarios are at average day demand, FCV-66, FCV-71, FCV-72, and FCV-73 set closed, FCV-73 set closed and firefighting flow. Comparing representative samples of the distribution main’s pressure field-test with the model-simulated values showed a reasonable and small difference to calibrate the model. The model analysis result showed the different problems of the system. These are aged pipes, oversized and undersized pipes, and high pressures. The system has been modified using the design criteria of velocity and pressure. High pressures in the existing system caused by customers at too low demand have been identified and solution is established using pressure-reducing valves. Finally, 10% of the total distribution mains are modified and 19.81% of the distribution mains are old enough, replaced with newer one. These modifications improved the performance of the system and saving 5,081m3/day amount of water leakage. Hydraulic Network Modeling and Upgrading of Legedadi Subsystem Water supply

Description

Keywords

Subsystem Water Supply

Citation