Skip navigation
 

Railway Engineering Collection home page

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 21 to 40 of 197
< previous   next >
Issue DateTitleAuthor(s)
Mar-2016Assessment of Railway Tunneling by Cut and Cover Method - Case study of the St. George Church Tunnel in Addis AbabaHenok Fikre (PhD); Mammo, Mumicha
Jun-2016Finite Element Analysis of Geosynthetic Reinforced Pile-Supported (GRPS )EmbankmentsMequannent Mulugeta (Mr.); Haleluya, Mesfin
Nov-2016Comparison of Floating Ladder Track and RHEDA2000 Ballast-less Track for Dynamic responsesMequannent Mulugeta (Mr.); Aklilu, Bekele
Jul-2015Flexural Performance Evaluation of Different Countries Concrete Sleepers for The Case Of Ethiopian Railway Track DesignTatek Fikadu (PhD); Mequanent Mulugeta (Mr.) Co-Advisor; Mesfin, Kebede
Dec-2014Extent of Adhesion Losses in The Wheel- Rail Contact Under Contaminated ConditionsDaniel Tilahun (PhD); Mesfin, Gebretsadik
Mar-2015Roll Pass Design of UIC 60 Rail Using Finite Element MethodDemiss Alemu (PhD); Mesfin, Akmel
Apr-2015Management of Regenerative Braking Energy for Addis Ababa Light Rail Transit SystemMengesha Mamo (PhD); Mequanint, Biazen
Apr-2014Modeling and Simulation of Crash Energy Management for Passenger Rail Vehicle EquipmentZewudu Abdi (PhD); Mandefro, Abebe
14-Apr-2016Comparative Study Of Railway Track Analysis And Design MethodsAbubeker Worake (PhD); Lijalem, Lemma
25-Apr-2017Analytical and Finite Element Analysis of Rail Deflection and Bending Stress Under Different Sleeper SpacingAbdulsater Siraj (Mr.); Lemmi, Gurmessa
22-Apr-2015Ethiopian Railway Corporation as a Multimodal OperatorBirhanu Beshah (PhD); Kidist, Hailu
Jun-2016Economical Analysis and Design for The Selection of A Pre-Stressed T–And Box Girder Railway BridgesAbrham Gebre (PhD); Khaire, Mohamed
Mar-2015Analysis of Aerodynamic Brakes in Mainline of Ethiopia Railway Corporation (Erc)Tsegaye Feleke (Mr.); Hillina, Admasu
Apr-2015Integrating urban public bus with LRT: Case of Leghar station.Eshetie Berhan (PhD); Henok, Kayamo
Dec-2016Accessibility and Suitability Analysis of Light Rail Station Location by using (AHP) and GIS: Case study on Existing and Future Expansion of Addis Ababa LRT RespectivelyAlemayehu Ambo (PhD); Gomeju, Taye
Aug-2014Influence of Wheel Materials on Thermal Load of BrakingDaniel Tilahun (PhD); Frehiwot, Alemayehu
Jan-2016Computer Program for Deflection Chart of Simply Supported Prestressed Railway GirderEssayas G/Yohannes (PhD); Fiseha, Nega
Jun-2016Investigation on LTE for Advanced Real Time Two Way Communication for Railway Operational Excellence: Case of Addis Ababa – Djibouti LineAbi Abate (Mr.); Farah, Mourad
May-2015Analysis of Train Energy Consumption Reduction by Passing Low Passenger Flow Stations in Off-peak Hour for Addis Ababa LRT Case Study on the Line of E-W Addis Ababa LRTTollossa Deberie (Mr.); Eshetu, Shewalema
Jun-2017Investigating the wheel wear of Addis Ababa Light Rail Transit (AALRT)Birhanu Beshah (PhD); Dula, Fekadu
Collection's Items (Sorted by Submit Date in Descending order): 21 to 40 of 197
< previous   next >