Title: Design Risk Management In Ethiopian Federal Road Projects
Authors: Getachew, Tsegaye
Advisors: Professor Abebe Dinku (Dr.‐Ing.)
Keywords: Risk management,
Design Risk,
Constructability,
Quality management,
Project delivery method
Copyright: Jul-2009
Date Added: 3-May-2012
Abstract: Abstract Project risks have significant impact on construction project’s performance in terms of cost, time and quality. Thus, managing the risks has been recognized as a very important management process in order to achieve the project objectives. The objective of this research is to examine whether design risks are contributory to cost and time overruns, and poor quality of works, and make recommendation based on the findings. The research, thus, reviewed 10 Road construction projects performed during the last 14 years, and conducted interviews with professionals of the Ethiopian Roads Authority (ERA) who are involved in procurement, design review, and monitoring implementation of Road construction projects at Federal level. The findings of this research revealed that design risks were contributory to cost and time overrun and poor quality of works. The underlying cause of the risks is that designers lack construction experience and fail to fully address constructability problems that surface during construction. And it was found that the breeding ground for design risks is the Design-Bid-Build project delivery method currently in place. This project delivery system is characterized by separation of phases which does not make use of construction experience in the development of design. Design-build Project delivery method allows collaborative efforts of Designers and Contractors in early phases and, therefore, lays the ground to minimize or manage the design risks by optimizing the design and construction personnel. Constructability problems which have an impact on time, cost, and quality are, therefore, better addressed with Design-Build project delivery method.
URI: http://hdl.handle.net/123456789/2396
Appears in:Thesis - Civil Engineering

Files in This Item:

File Description SizeFormat
Getachew Tsegaye.pdf1.21 MBAdobe PDFView/Open

Items in the AAUL Digital Library are protected by copyright, with all rights reserved, unless otherwise indicated.

 

  Last updated: May 2010. Copyright © Addis Ababa University Libraries - Feedback